Design Requirements for Connections to the UCL District Heating Network

The following guidance should be provided to all parties relevant in connecting buildings to Õ¬ÄÐÊÓƵ Bloomsbury campus district heating network

Contents includes:Ìý

  • Glossary
  • Who is this guide for?
  • Scope of this guide
  • Introduction
  • Design approval process
  • Project responsibilities
  • Heat substation room design
  • Secondary heating system design
  • Appendix: Typical required secondary heat system schematic

Download documentÌý

Last updated: Thursday, July 6, 2017

Disclaimer

This guidance is for information only, UCL accepts no liability for any loss, damage or inconvenience caused as a result of reliance on this information. Before signing agreements for any design work, appropriate legal and engineering professionals should be consulted.